Mar 11, 2026 · The line is designed for maximum operating speeds of 250 km/h, connecting Stockholm to Linköping and creating the foundation for a future fast …
SydVästlänken has a total length of 430 km, consisting of both overhead and underground power lines. The DC power cable between the Hurva and Barkeryd …
The East Link (Swedish: Ostlänken) is a high-speed railway project under construction in Sweden, intended to run from Södertälje (just south of …
Apr 15, 2026 · Finland is set to get its first cross-border rail link with continental Europe this summer. The long-delayed connection with Sweden could launch as early as June, a
Starting in June 2026, rail passengers will once again be able to travel between Finland and Sweden, with Finnish VR trains running to a refurbished Haparanda station. From there,
Feb 14, 2023 · The East Link, Gothenburg–Borås and Hässleholm–Lund projects are underway. There is not enough capacity on the Swedish railway and an …
This is made possible by the Öresund link that runs between Lernacken to the south of Malmö, Sweden and a manmade peninsula outside Kastrup in …
Apr 15, 2026 · Train passengers will now be able to travel between Finland and Sweden as a new £1.65m rail service opens this summer. The new link will allow travellers to cross
In a little more distant future, a new railway connecting Linköping-Göteborg via Jönköping is planned, called Götalandsbanan. Together, the Ostlänken and Götalandsbanan rail